CSIRO Solar Farm - Mayfield West Laborartory

Case Studies • May 11, 2018

Solar Energy and farming remains at the forefront for renewable technology. Michilis were engaged by CSIRO to carry out the earth & civil works to support this sophisticated infrastructure. Precision on this Project was the outcome. Each footing & bolt configuration was placed precisely in order to gain the maximum directional line for the reflecting mirrors. These mirrors (once positioned correctly) reflected back to the heat ex-changer located at the apex of the tower.